Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
en:stwst_als_oeffentlicher_raum [2019/02/25 09:54] – tanja | en:stwst_als_oeffentlicher_raum [2019/04/06 13:27] – tanja | ||
---|---|---|---|
Line 8: | Line 8: | ||
\\ | \\ | ||
- | In a practical implementation phase from December 2017 to March 2018, the public areas of the house were declared as a circulating performative and scientific research | ||
- | At the beginning of the project, a text appeared in the [[http:// | + | At the beginning of the project, a text appeared in the [[http:// |
- | Filmscreening [[https:// | + | |
\\ | \\ | ||
+ | In a practical implementation phase from December 2017 to March 2018, the public areas of the house were declared as a circulating performative and scientific research | ||
+ | |||
+ | Several research projects, communicative processes and smaller interventions accompanied the project. | ||
+ | |||
+ | On November 10th, in the early evening hours, the scenic reading [[https:// | ||
Under the title "The Public Space and the Open End", a text has been published with the practical end of the project (the part sponsored by LINZim PULS) in the paper [[http:// | Under the title "The Public Space and the Open End", a text has been published with the practical end of the project (the part sponsored by LINZim PULS) in the paper [[http:// | ||
- | \\ | ||
- | Several research projects, communicative processes and smaller interventions accompanied the project. | ||
- | |||
- | \\ | ||
- | [[https:// | ||
- | On November 10th, in the early evening hours, the scenic reading " | ||
\\ | \\ | ||
**Additionally from the project context:** | **Additionally from the project context:** | ||
- | In 2018, artistic and scientific works have been implemented or are in the planning stage which additionally have developed from the project context. A further theoretical and practical phase is implemented in winter 2018/19 in cooperation with the Kepler University. | + | |
+ | In 2018, artistic and scientific works have been implemented or are in the planning stage which additionally have developed from the project context. | ||
+ | |||
+ | A further theoretical and practical phase is implemented in winter 2018/19 in cooperation with the Kepler University. | ||
+ | |||
+ | In the neighbouring Hinsenkamppassage in Linz's urban space, an artistic-discursive project was also implemented in summer/ | ||
It is potentially possible to develop the project in further artistic work. | It is potentially possible to develop the project in further artistic work. |