Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
en:stwst_als_oeffentlicher_raum [2019/02/25 09:54] tanjaen:stwst_als_oeffentlicher_raum [2019/05/31 14:40] (current) tanja
Line 8: Line 8:
  
 \\ \\
-In a practical implementation phase from December 2017 to March 2018, the public areas of the house were declared as a circulating performative and scientific research  area. Two scientists and eight performers were involved in the project from Nov 2017 to March 2018.  
  
-At the beginning of the project, a text appeared in the [[http://versorgerin.stwst.at/artikel/dec-1-2017-1200/ich-wei%C3%9F-wo-dein-beisl-lebt|Versorgerin]]. Furthermore, a publicly accessible discussion on the topic took place: [[https://newcontext.stwst.at/discursive-media/strom_um_sieben|Strom um sieben / 2018 March, 26th]] +At the beginning of the project, a text was published in the Versorgerin #116: [[http://versorgerin.stwst.at/artikel/dec-1-2017-1200/ich-wei%C3%9F-wo-dein-beisl-lebt|Ich weiß, wo dein Beisl lebt, Dez 2017]]. Furthermore, a publicly accessible discussion on the topic took place in the frame of "Strom um sieben, March 2018: [[https://newcontext.stwst.at/discursive-media/strom_um_sieben|Bis jetzt ist alles gutgegangen? - Öffentlichkeit und Verdängung]]. Plus Filmscreening [[https://newcontext.stwst.at/tools/announce-all#aktuelle_veranstaltung|"La Haine"]], Mathieu Kassovitz - March 25th, 9 p.m., Moviemento 
-Filmscreening [[https://newcontext.stwst.at/tools/announce-all#aktuelle_veranstaltung|"La Haine"]], Mathieu Kassovitz - March 25th, 9 p.m., Moviemento  +
-\\ +
- +
-Under the title "The Public Space and the Open End", a text has been published with the practical end of the project (the part sponsored by LINZim PULS) in the paper [[http://versorgerin.stwst.at/artikel/dec-6-2018-2100/der-%C3%B6ffentliche-raum-und-das-offene-ende|Versorgerin]]+
  
 \\ \\
 +In a practical implementation phase from December 2017 to March 2018, the public areas of the house were declared as a circulating performative and scientific research  area. Research of STWST, plus two scientists and eight performers were involved in the project from Nov 2017 to March 2018. 
 +
 Several research projects, communicative processes and smaller interventions accompanied the project.  Several research projects, communicative processes and smaller interventions accompanied the project. 
 +
 +The results were communicated internally and partly externally, and form the basis for further artistic-scientific-social circulation.
  
 \\ \\
-[[https://newcontext.stwst.at/en/tools/social_sleep|Social Sleep]] + 
-On November 10th, in the early evening hours, the scenic reading "Social Sleep" was performed in Cafe Strom and in the public areas of the house - as the last part of the project in its original conception and at the same time as a potential beginning of a continuation of the project in further artistic circulation. +On November 10th, in the early evening hours, the scenic reading "Social Sleep" was performed in Cafe Strom and in the public areas of the house - as the last part of the project in its original conception and at the same time as a potential beginning of a continuation of the project in further artistic circulation. [[https://newcontext.stwst.at/en/tools/social_sleep|Social Sleep]] 
 + 
 +Under the title "The Public Space and the Open End", a text has been published with the practical end of the project (the part sponsored by LINZim PULS) in the paper Versorgerin, Issue # 120 [[http://versorgerin.stwst.at/artikel/dec-6-2018-2100/der-%C3%B6ffentliche-raum-und-das-offene-ende|Der öffentliche Raum und das offene Ende]] 
  
 \\ \\
 **Additionally from the project context:** **Additionally from the project context:**
-In 2018, artistic and scientific works have been implemented or are in the planning stage which additionally have developed from the project context. A further theoretical and practical phase is implemented in winter 2018/19 in cooperation with the Kepler University.  
  
-It is potentially possible to develop the project in further artistic work.+In 2018, artistic and scientific works have been implemented or are in the planning stage which additionally have developed from the project context.  
 + 
 +A further theoretical and practical phase was implemented in winter 2018/19 by the Kepler University.  
 + 
 +\\ 
 + 
 +In the neighbouring Hinsenkamppassage in Linz's urban space, an artistic-discursive project was also implemented in summer/autumn 2018. This text was published in Versorgerin #120: [[http://versorgerin.stwst.at/artikel/dec-6-2018-2057/das-hinsenkamplabor|Das Hinsenkamp Labor]]. 
 + 
 +In a further theoretical and practical phase in winter 2018/19, the Kepler University took a further step towards "publicity and displacement" in urban space. Here the STWST was also integrated as a location. A text on the larger context has been published by the Versorgerin 122:  [[http://versorgerin.stwst.at/artikel/may-29-2019-2151/kapitalistische-landnahmen-und-die-stadt|Kapitalisische Landnahmen und die Stadt]] 
 + 
 + 
 +This theme is an ongoing theme of the house - and a further processing of the project in an artistic way is also planned 
  
  
Line 33: Line 46:
 With support from LINZimPULS. With support from LINZimPULS.
 {{:logo_linz.jpg?150|}}  {{:logo_linz.jpg?150|}} 
 +
 +
 +
 +